Dan Caruso

Gigawatts

The untold story of ambition, real estate and raw power, from the mainframe to the AI gold rush

First draft, November 2026. Published online and still being revised.

A history of the data center, from 1960s time-sharing through the dot-com hosting boom and bust, Equinix and the cloud, to today’s AI build-out. A collaboration between Claude and Dan Caruso, author of Bandwidth.

Read the first draft of GigawattsOpens gigawatts.vercel.app

I’ve lived through one Boom, Bust and Resurgence cycle, and I wrote a book about it. The data-center industry has already been through one of its own. It is in the middle of a second, bigger one right now, and this time the stakes are measured in gigawatts.

From the preface

Details

Edition
First draft
Date
November 2026
Length
Nine chapters, four appendices

The other books